Define DART destination
Now that you have defined a Content Repository is time to set up CxLink to start managing all new attachments uploaded to your system. To do so, in the following configuration steps you will assign all documents attached to the SOFFHIO class, category SOFFDB to the content repository of your choice by using the Cxlink Category /LNKAWS/AT.
To perform this operation:
-
Navigate to FTWP
- In the Archivelink configuration tab, note down the assigned Content Rep. ID. for later migrations if needed.
- Press Configuration button in the Data extract files section.
- Change the Content Rep. ID for the new one.
- Edit the existing object BUS4010 and set the proper Content - Repository ID in the Cont.Rep.Id column.
- Press Configuration button in the Data view files section
- Edit the existing object BUS4011 and set the proper Content Repository ID in the Cont.Rep.Id column
- Save and exit
- Jump to the File Directory tab note down the Dir.Set., set if any.
-
Navigato to OAC0
- Double-click in the Content Rep. ID that you previously created.
- Press Change to edit and Full Administration button for extended information.
- In the Basic Path and Archive Path parameters, set the previously note down Directory or, if there was not directory defined, select a path to store temporary files.
-
If you want to understand better what is done in the background, you can verify the change by accessing SKPR08 transaction, the categoty /LNKAWS/AT assigned to the SOFFHIO class. You can see that changes in the OACT transaction you can see the content repository attached to the category /LNKAWS/AT.